700R4 Rebuild PT7: Case Air Checks and Shift Calibration

Информация о загрузке и деталях видео 700R4 Rebuild PT7: Case Air Checks and Shift Calibration
Автор:
Nick's TransmissionsДата публикации:
31.03.2023Просмотров:
11.2KОписание:
This section covers installation of all 'belly' components and shows a case air check being performed to validate that all applied elements function properly when air is introduced into the clutch circuit. I also discuss shift calibration based on application and give tips/pointers when it comes to setting up your shift firmness.
Похожие видео: Rebuild PT

700R4 Rebuild PT1: Overview

700R4 Rebuild PT3: Measuring for Pump Clearances

700R4 Rebuild PT4: Pump, Servo, 1-2 Acc and Reverse Input Drum + Solving Rev Input Clearance Problem

700R4 Rebuild PT8: Final Assembly

700R4 Rebuild PT6: Case Assembly

